Manufacturing
From steel sheet to finished safe
Six workshops and three customization production lines on a site of about 10,000 square metres.
The production sequence
Step 1: Cutting
Steel sheet is cut to the sizes each cabinet needs.
Step 2: Precision
Parts are formed and checked so doors and frames align.
Step 3: Welding
Cabinet bodies and doors are welded into solid structures.
Step 4: Grinding
Weld seams and edges are ground smooth before finishing.
Step 5: Coating
Colour and surface finishes are applied in the coating shop.
Step 6: Assembly
Locks, hardware and interiors are fitted and the cabinet is packed.







Capacity and customization
- 10,000 m²
- Site area
- 3
- Customization production lines
- About 3,000 units
- Monthly capacity
Normal production time is about 30 days, with the schedule confirmed for your order.
Inspection and order progress
Inspection and report support is available, and progress is communicated through production.
Step 1: Requirement
Share the model, size, material, colour, process and quantity you need.
Step 2: Sample confirmation
Approve a charged sample before production begins.
Step 3: Production progress
Production runs on the customization lines, with progress updates to you.
Step 4: Inspection
Inspection and report support is available before the order leaves.
Step 5: Packaging
Packaging is included, ready for the shipping arrangement you choose.